Electrical / welding and cutting work
Before each welding, cutting, blow-torch, or similar ignition-source task where the constructor or employer uses a hot-work permit control.
02Elevating work platform operations
Daily before use, in accordance with the manufacturer's instructions, for every elevating work platform used on the project.
03Excavation and trenching
Before workers enter an excavation or trench and whenever site, soil, water, weather, support-system, or adjacent-structure conditions change.
04General construction supervision
At least weekly for the supervisor inspection required by section 14(4). Toolbox talks may be documented on the same cadence when used to communicate inspection findings, hazards, and controls.
05Portable ladder use
Before first use on each shift and whenever the ladder is moved, damaged, or exposed to a new hazard.
06Scaffold erection and use
Before use after erection, alteration, adverse weather, impact, or any condition change.
07Confined space entry
Before every confined-space entry and whenever atmospheric, rescue, isolation, or work-scope conditions change.
08Forklift and powered industrial truck operation
Before each shift or first use by the assigned operator.
09Fall protection equipment inspection
Before each use and after any fall arrest event, impact, visible damage, or manufacturer-specified trigger.
10Traffic control plan implementation
Before lane occupation, traffic staging changes, shift changes, or municipal inspection.
11Crane, hoist, and rigging lifts
Before critical lifts, repeated lift sequences, equipment changes, ground-condition changes, or weather changes.
12Propane cylinder storage and use
Daily when propane is stored or used on site and whenever storage locations change.
13Silica dust control work
Before dust-generating work starts and whenever cutting, grinding, drilling, ventilation, or wet-control conditions change.
14Asbestos abatement notification and control
Before abatement begins and whenever enclosure, type of operation, worker access, or clearance status changes.
15Roofing fall protection controls
Before roofing work starts and whenever edge exposure, access, weather, or work area changes.
16Demolition pre-start controls
Before demolition begins and when hidden services, structural instability, or adjacent occupancy conditions change.
17Lockout and tagout isolation
Before service, maintenance, demolition, tie-in, or energization work begins.
18First aid station and kit inspection
At the start of the project, at least monthly, and after any first aid supply use.
19Fire extinguisher inspection
Monthly and before hot-work, fuel-storage, or high-risk ignition work areas are released.
20Site orientation and worker sign-in
Before a worker, visitor, subcontractor, or delivery person enters active construction areas.